Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Bodywork and interior
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #12  
Old 23rd January 2012, 12:38 AM
Toyotus Toyotus is offline
Junior Member
 
Join Date: Dec 2011
Posts: 14
Default


Here is the pedal base/box with all tabs welded on and painted. Leaving all holes undrilled until I'm ready to mount master cylinders/cable guide, ect. I had a hard time finding a sleeve for the pivot bolts. Finally found exactly what I needed in stainless, for $5.49/ft.! Luckily that did all three bushings and a castor wheel for my creeper!
I actually drilled and tapped and installed some 5/32 grease zirks too, as I still perfer the idea of the nylon riding on the bolt, instead of metal on metal, might as well just use a solid 1" (25mm) spacer drilled for the pivot bolt. Either way, I suppose this will be longer lasting this way.

Last edited by Toyotus : 23rd January 2012 at 12:42 AM.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 08:06 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.