![]() |
#15
|
||||
|
||||
![]() Just for an update: My gas valve arrived last week so i started practising welding and i got the hang of it quite quickly. So i then set to work tacking up the bottom chassis rails, once i'd done that i decided to flip it over to make sure it was symmetrical....it wasnt. The 2 pieces with the massive angle on them were not the same, meaning it sat slightly over to the left hand side, i got all of that sorted and it is symmetrical now.
I've tack welded the front frame together now, after reading through chris's tutorial on it a few times i managed to get it all right first time ![]() I've also started tack welding the uprights onto the bottom rails, its all starting to come together now ![]()
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting ![]() |
Thread Tools | |
Display Modes | |
|
|