Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #6  
Old 20th October 2009, 11:12 PM
londonsean69 londonsean69 is offline
Senior Member
 
Join Date: Nov 2008
Location: Surrey/South London Border
Posts: 453
Default

Well, thought I would post a little update.

The chassis is about 90% tacked up now, just the drivers panel on the transmission tunnel, suspension brackets, and seatbelt/harness brackets to add (plus some of the smaller bits like the brake line brackets)

I think that by close of play tomorrow, I should have started fully welding

Picked up an MT75 gearbox from Locostbuilders for £50, so that will get a lick of paint at some point.

Also picked myself up a plasma cutter, so have been playing (learning) with that.

Work has taken a frightening downturn, so, by mutual agreement, I am doing 3.5 day weeks for a while. This is good, as I have loads of other stuff to do, not to mention it gives me more time in the garage!!

I've uploaded another half dozen or so pics to Photobucket (link in signature)
__________________
Sean
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 07:45 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.