![]() |
#11
|
||||
|
||||
![]() Skov,
your chassis is looking good. I'm very nearly at a similar stage, all the chassis welding done, just piddling about with brackets for engine, g'box and rad. mounts prior to painting. Thinking one or two steps ahead, as one does, I already had it in mind to run a strip/channel down the trans. tunnel to secure the 'services' to and your clips look just the job. Like you, I don't fancy drilling too many holes in the chassis to mount stuff on. The fixings you have sourced look just the like those I had in mind. Thanks for offering your surplus to the forum. Have you any left? I think 10 would do; spaced at 150 mm (half the width suggested in IVA manual) that number would cover a length of 1500 mm, which is plenty enough to get through the trans. tunnel. How much and how would you like to be paid? |
Thread Tools | |
Display Modes | |
|
|