Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 5th October 2011, 07:58 AM
eSteve's Avatar
eSteve eSteve is offline
Senior Member
 
Join Date: Jan 2010
Location: Dorset
Posts: 171
Thumbs up Chassis looking good. Clips? Yes please...

Skov,

your chassis is looking good. I'm very nearly at a similar stage, all the chassis welding done, just piddling about with brackets for engine, g'box and rad. mounts prior to painting.

Thinking one or two steps ahead, as one does, I already had it in mind to run a strip/channel down the trans. tunnel to secure the 'services' to and your clips look just the job. Like you, I don't fancy drilling too many holes in the chassis to mount stuff on.

The fixings you have sourced look just the like those I had in mind. Thanks for offering your surplus to the forum. Have you any left?

I think 10 would do; spaced at 150 mm (half the width suggested in IVA manual) that number would cover a length of 1500 mm, which is plenty enough to get through the trans. tunnel.

How much and how would you like to be paid?
__________________
Regards,

eSteve

Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 02:19 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.