Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #32  
Old 24th June 2012, 07:20 PM
Johno's Avatar
Johno Johno is offline
Senior Member
 
Join Date: Sep 2011
Location: Lutton (East Anglia)
Posts: 497
Default

Well it's been a few weeks and I've hardly touched the car, but I did manage to get a day on it yesterday.

Mounted the fuel tank with its bracket for the first time after painting, just got to fit an earth strap and vent valve which I'm going to incoporate onto the original MX5 fuel sender flange.



I'm going to fit another Terry clip and probably a Jubilee clip to a bracket behind the fuel filter to make it more secure, will see what it's like when I've fitted the Terry clip first but not sure if this will be good enough for IVA (will it need a Jubilee to make it impossible to come loose)?

Got my front brake pipes installed at last. I've left them long at the front untill I decide where I'm going to fit the bulkhead connectors.



Also fitted some brackets to my fuel pipes in the engine bay which will be painted later with other stuff. All I need to do is cut them to length and either flare them somehow or solder a olive to create step for my hose clip.



Fitted my steering column to make sure all parts in the engine bay area are clear of the shaft.



Oh bugger 4 picture rule kicked in...LOL

Johno
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 01:22 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.