![]() |
|
#1
|
|||
|
|||
![]() out of interest tt, how are you dealing with rivnuts? and anything that will be riveted on (panels, brackets, brake lines, etc)? is everything just offered up and temporary clamped bit by bit?
__________________
http://meandthekitcar.wordpress.com/ |
#2
|
||||
|
||||
![]() Bearing arrived this morning, removed the sloped rubber bush support and bolted the bearing on - much better! Steering feels nice and solid now, thanks for the help
![]() ![]() |
#3
|
||||
|
||||
![]() Quote:
Bodywork is either self cutting screws or rivnuts. There are a few areas of brake pipe work that will be directly attached to the chassis but this will also be with self cutting screws. The floor pan, trans tunnel sides, seat back, lower firewalls are permenantly fixed. the re-build should only take a couple of days once everything is planned and trial built. TT
__________________
You only get a woosh with a dump valve Build Thread Man Cave Mantiques Cecil Street Auto Repairs Garage Carlisle Build Cost £4181.65 - Last - Wheel Cylinders |
![]() |
Thread Tools | |
Display Modes | |
|
|