![]() |
#11
|
||||
|
||||
![]() I have put the Air filter in position today and lengthened the air flow meter cable to reach.
Ill probably get an aluminum U bend to replace the rubber part so that it doesnt try and crush when it bends round. I have some sip ties holding it open at the moment. I also carried on a little with my dashboard. Stuck the aluminium parts to the MDF and rounded the edges with a rasp. I added some extra MDF to the back at the bottom so I can radius round a bit.
__________________
1.6 Mazda B6 : Garrett TBO339 : 420cc WRX Injectors : FMIC : Microsquirt V3 : LC-2 Wideband : Toyota COP : 1.8 ATB LSD Build Started Jan 2013 : OTR Aug 2014 : Still OTR June 2024 |
Thread Tools | |
Display Modes | |
|
|