![]() |
#15
|
||||
|
||||
![]() Hi,
Now that I have cut the floor, I can come back on this thread. I marked the drilling points on the ally plate, and it is clamped to the chassis. But I was wondering, what is the right order ? - drill - unclamp - Sikaflex - rivets or : - Sikaflex - clamp - drill - rivets Thank you.
__________________
Sylvain Pictures of my completed Roadster https://www.flickr.com/photos/994983...7646799525542/ Build blog: http://vouchtroadster.blogspot.se/ https://caferacer-kawa-gpz-zx550.blogspot.com/ |
Thread Tools | |
Display Modes | |
|
|