Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #29  
Old 19th March 2014, 08:56 AM
thailoz thailoz is offline
Senior Member
 
Join Date: Mar 2013
Location: Thailand
Posts: 140
Default holiday time

Well Schools out for about six weeks so I have time to work on the car starting this week. First thing I did this week was to make a small electrolysis tank (2gallon bucket) may have to make a bigger one as it works really well.

I also got all my transmission tunnel tacked in place including making the hand brake lever.

Next is CP11 I have the already laser cut from 2mm steel just need to bend the 25mm X 2 mm strip round them.
After that fit the front diagonals and now I can also fit the seat back diagonals with those dreaded compound angles.
Then weld up all the tacked rear and transmission tunnel.

check out the blog for details and pics
__________________
My build diary is at http://thailoz.wordpress.com/
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 03:18 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.