![]() |
#25
|
||||
|
||||
![]() Well todays job has been to finish wiring my ECU and mount it and the EDIS 4 unit to my bulk head which went without a hitch. I also tidied up the wiring under the dash so the cable runs are a lot better and they are nicely secured to the chassis.
![]() I then set about trimming my bulkhead so that it fit with the side panels, it now looks a lot tidier. I haven't got any photos of that though I'm afraid. Finally I finished my headlight wiring at the relay holders and ordered the relays I need for the headlights and indicators (LED specific one for my lights). Hopefully they will arrive soon and I'll be able to test the functionality of them. I need to order some new bullet connectors for my front indicators so I can connect those up and run some ground connections. It is feeling like the end is in sight now that I am finishing off jobs. I am now aiming for getting it on the road next spring, with a potential track session for a shake down prior to that.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting ![]() |
Thread Tools | |
Display Modes | |
|
|