![]() |
|
#1
|
||||
|
||||
![]() I used a Lazy riviter and it was easy work.
TT
__________________
You only get a woosh with a dump valve Build Thread Man Cave Mantiques Cecil Street Auto Repairs Garage Carlisle Build Cost £4181.65 - Last - Wheel Cylinders |
#2
|
|||
|
|||
![]() I went 2mm steel floor and welded it all around in sections. It has a slight ripple but nothing too bad. Tbh i prefer to have the extra strength
![]() ![]() |
#3
|
|||
|
|||
![]() Thanks guys good advise
Phil with regards to the Front frame am I correct in saying you cut ff2 at 13 degrees then weld together once in the jig to keep the faces at 90 degrees
__________________
My build diary is at http://thailoz.wordpress.com/ |
#4
|
||||
|
||||
![]() Yes the angles are 13' at the top of FF2 and FF3 with the outer sides 90' to the base of your jig. If you screw/weld two perfect 90' cubes to your jig then clamp FF2 + FF3 to them this will help later when you come to fit your top suspension brackets.
__________________
Website http://www.talonmotorfabrication.co.uk/ Direct email phil@talonmotorfabrication.co.uk talonmotorfabrication@gmail.com Mobile office hours 07514098334 |
#5
|
|||
|
|||
![]() thanks again I will give the a try
__________________
My build diary is at http://thailoz.wordpress.com/ |
#6
|
||||
|
||||
![]() You may also consider using sealed rivets as these don't let water into the box section
__________________
17.07.10 "Now i know the meaning of life" My Build pics http://www.flickr.com/photos/67605695@N04/ http://www.flickr.com/photos/97412063@N08/ |
![]() |
Thread Tools | |
Display Modes | |
|
|